Applicable Versions | NetSim Standard | NetSim Pro |
Applicable Releases | v13 | v14.0 |
The SNR calculation in the SSB and the SINR calculations in the PDSCH and PUSCH are done:
- First when the two MIBs are sent (at 80ms and 160ms)
- Next when the RRC_SI is sent
- Next when the RRC setup is sent
- Subsequently at every 120ms (UE Measurement interval) when the UE measurement report is sent
- Every instance when a UE moves
Useful links
1. Overview of NetSim 5G library: https://tetcos.com/5g.html
2. NetSim 5G documentation (v13.3): https://www.tetcos.com/help/v13.3/Technology-Libraries/5G-NR.html